| Print.

Line U6

U-Bahnhof Tempelhof

Between Alt-Tegel underground and Alt-Mariendorf underground stations.

Today's U6 line has 29 stations on a track of 19.9 kilometres stretching from Tegel to Mariendorf.
The city of Berlin planned to construct an undergound line on the north/south axis beneath Friedrichstraße as early as 1901. Werner von Siemens had made plans to build a line under Nobelstraße. At that time, city authorities thought that public transport should remain under municipal control. They therefore turned down an offer by Siemens, and built the undergroun line themselves.


Route Information U6 PDF Download

U Alt-Tegel Symbol for a horizontal double arrow. U Alt-Mariendorf


Station name Mobility indicator
U Alt-Tegel scope B [13][12]
U Borsigwerke scope B [13][12]
U Holzhauser Straße scope B [13][12]
U Otisstraße scope B [13][12]
U Scharnweberstraße scope B [13][12]
U Kurt-Schumacher-Platz scope B [13][12]
U Afrikanische Straße scope B [13][12]
U Rehberge scope B [13][12]
U Seestraße scope B [13][12]
U Leopoldplatz scope B [13][12]
S+U Wedding scope A [13][12]
U Reinickendorfer Straße scope A [13][12]
U Schwartzkopffstraße scope A [13][12]
U Naturkundemuseum scope A [13]
U Oranienburger Tor scope A [13]
S+U Friedrichstraße scope A [13][12]
U Französische Straße scope A [13]
U Stadtmitte scope A [13]
U Kochstraße scope A [13][12]
U Hallesches Tor scope A [13][12]
U Mehringdamm scope A [13][12]
U Platz der Luftbrücke scope A [13][12]
U Paradestraße scope A [13][12]
S+U Tempelhof scope A [13][12]
U Alt-Tempelhof scope B [13][12]
U Kaiserin-Augusta-Straße scope B [13][12]
U Ullsteinstraße scope B [13][12]
U Westphalweg scope B [13][12]
U Alt-Mariendorf scope B [13][12]

Bold stations are start or stop points.

Notes

  • scope A scope B scope C scope
  • Lift not in operation
  • Wheelchair access / For transfers, lift only available for S-Bahn (urban rail)
  • Wheelchair access / For transfers, lift only available for U-Bahn (metro)
  • Ramp access
  • Lift
  • Guidance system for visually impaired
  • Escalator
  • [6]Boarding/exiting on platform
  • [5]Boarding/exiting on pavement (sidewalk)
  • [4]Boarding/exiting on street
  • [12]Bike + Ride
  • [13]DAISY digital departure display

Line the course with all interchanges

Linienverlauf U6 während der Bauarbeiten

Traffic news on this line

Route Effective Reason and impact
U6 from 22.08.2012 04:00
till 01.11.2013 03:30
Sperrung wegen Bauarbeiten der BVG; 1

Journey planner

Map of the City

Stadtplanausschnitt der U55 mit dem Stand 2005