Construction



Construction phase 1

The U55 Shuttle Line from Hauptbahnhof to the Brandenburg Gate

When the construction site has been completely set up, excavation will be carried out above the groundwater level. The passageway to the urban rail system (S-Bahn) will also be cut off at this time.

The foyer of the S-Bahn station and the south-western exit in front of the Adlon Hotel will remain accessible throughout the entire construction period. The site will be covered to prevent dust pollution.

Only conventional construction techniques can be used here, namely an open excavation pit protected by fencing.

Construction phase 1: Removal of the urban rail (S-Bahn) passageway

Action:
Demolition of S-Bahn passageway

Site surface area:
approx. 2200 sqm (66 m x 32 m)

Emissions:
"Open construction site" Moderate noise pollution, within legal limits Dust generation reduced by sprinkling

Material transport:
Removal of excavated earth

Site traffic:
approx. 3 lorries per hour


All material on this website is protected under German and international copyright, trademark and competition laws. Reproduction, transfer, distribution, storage or modification of part or all of the contents of our site in any form, modified or not, is prohibited unless you receive our written permission. Only non-commercial private use is allowed to the extent permitted by copyright laws.