Construction



Construction phase 5

The U55 Shuttle Line from Hauptbahnhof to the Brandenburg Gate

While structural work continues on the station, this phase includes adding a provisional metro platform, and very importantly, extending the stairway entrance as well as constructing a new passageway to the urban rail station (S-Bahn). An elevator will also be installed.

This will allow wheelchair access to the Unter den Linden urban rail station (S-Bahn) for the first time. Preparations will also be made for installing escalators.

Construction work can probably be reduced to a minimum at this time. Traffic at the site will also be greatly reduced when the structural work is completed.

Construction phase 5: New western exit

Action:
Building new stairs and elevators on the central promenade

Emissions:
Little or no noise pollution (underground construction work, cryogenic system in access structure).
Moderate noise pollution from loading and traffic.

Material transport:
Delivery of extension materials

Site traffic:
Delivery traffic


All material on this website is protected under German and international copyright, trademark and competition laws. Reproduction, transfer, distribution, storage or modification of part or all of the contents of our site in any form, modified or not, is prohibited unless you receive our written permission. Only non-commercial private use is allowed to the extent permitted by copyright laws.