Construction phase 6
The U55 Shuttle Line from Hauptbahnhof to the Brandenburg Gate
Work on the second entry, which is required for fire protection
reasons, can only start when the station shell is completely
finished.
The second entry will be installed in the initial shaft to the
east.
For further extension work on the U5 line linking Alexanderplatz to
the Brandenburg Gate, subterranean shield driving machines can be
docked directly onto this tunnel, which means that no additional
deep tunnel work will be necessary at this site
Construction phase 6: Second exit
Action:
Constructing a second entry east of Wilhelmstraße
Emissions:
Moderate noise pollution from loading and traffic. Moderate noise
pollution from open construction pit and cryogenic soil
treatment.
Material transport:
Removal of excavated earth, delivery of construction
materials.
Site traffic:
approx. 2 lorries per hour